Results 1 to 10 of 10

Thread: First!

  1. #1

    First!

    Looking forward to new lights!

  2. #2
    Administrator
    Join Date
    Sep 2011
    Location
    Sterling, VA
    Posts
    5
    Blog Entries
    1
    Stephen is working on getting things going. I'm going to be converting his old site over to this new one, so within a few weeks we should have and order page up.

    Please spread the word to let other folks know!

  3. #3
    Cool !

    Thanks for the update!

  4. #4

    Steady progress

    Just wanted to make a comment in this thread that the on-line store is coming, but just a bit later than I hoped since the metal cutting process is taking longer than expected.

    Look out for new progress updates on the Build Blog.

    Lot of good images over on the Photos Forum.

    Thanks!
    Last edited by Stephen; 12-04-2011 at 11:30 AM.

  5. #5

    Status Update

    Just realized that this thread had gotten a little stale and needed some updating.
    SO.... long story short, the debut of the original online store, was, how shall we say, less than a raving success (thanks to some very clever hackers). So, in the interim for all build #2 lights, I've been taking the orders the "old fashioned way" (in my best Smith Barney impression). In fact, as of March 26, 2012, all but a couple of headlights have been spoken for from build #2. Now, that's not to say that a few of those orders may fall through given the wait time? (Always a possibility).

    Build #3 will be fairly limited, probably around 30 taillights and 20 headlights. Although we have all the new store software up and running and confirmed "hacker proof," I may or may not take the time to re-build it since I have the EXCEL method working now. So for now, if you know that you don't want to miss out on these lights, and don't mind waiting (potentially months), I'm slowly populating a "build #3" database, and you can shoot me an email if your interested in being on it. After build #3, I plan on taking an indefinite "break" from any new light building.

  6. #6
    Junior Member
    Join Date
    Mar 2012
    Location
    Crystal Bay, NV
    Posts
    10
    Hopefully not too long of a break. I plan on showing-off your lights to the bike shops in my area and hopefully build some interest in your products for others

    - Roger

  7. #7
    Junior Member
    Join Date
    Mar 2012
    Location
    Miami, Florida - United States of America
    Posts
    15
    Definitely a wild and very interesting ride for Build #2.

  8. #8

    Build #3

    OK, so due to the overwhelming demand for the lights (especially the taillight), I'm going to try and boost the total number of lights for build #3. If you've emailed me prior to today (June 25, 2012), then that means that you'll mostly likely be able to get some hardware. I'll have to cut off the increase, though, in just a few days when we start cutting housings.

    Stephen

  9. #9

    Dang!

    Please put me on the waiting list in case someone falls out.
    I have a credit card waiting to be used!!!!

    Thanks so much!
    paul
    Last edited by pkirkll; 07-06-2012 at 09:29 PM. Reason: edit

  10. #10
    Surly a wild and very interesting ride for Build #2.I simply say thanks for the contribution.



    trade mark attorneys Queensland
    Last edited by markbitter; 04-05-2013 at 09:49 AM.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •