View Full Version : First!
CDA 455
10-11-2011, 09:05 PM
Looking forward to new lights!
DSadmin
10-12-2011, 09:37 AM
Stephen is working on getting things going. I'm going to be converting his old site over to this new one, so within a few weeks we should have and order page up.
Please spread the word to let other folks know!
CDA 455
10-18-2011, 06:47 AM
Cool :cool: !
Thanks for the update!
Stephen
12-01-2011, 01:07 AM
Just wanted to make a comment in this thread that the on-line store is coming, but just a bit later than I hoped since the metal cutting process is taking longer than expected.
Look out for new progress updates on the Build Blog (http://www.designshinelighting.com/blog.php).
Lot of good images over on the Photos Forum (http://www.designshinelighting.com/showthread.php?3-Official-DesignShine-photos).
Thanks!
Stephen
03-26-2012, 11:35 AM
Just realized that this thread had gotten a little stale and needed some updating.
SO.... long story short, the debut of the original online store, was, how shall we say, less than a raving success (thanks to some very clever hackers). So, in the interim for all build #2 lights, I've been taking the orders the "old fashioned way" (in my best Smith Barney impression). In fact, as of March 26, 2012, all but a couple of headlights have been spoken for from build #2. Now, that's not to say that a few of those orders may fall through given the wait time? (Always a possibility).
Build #3 will be fairly limited, probably around 30 taillights and 20 headlights. Although we have all the new store software up and running and confirmed "hacker proof," I may or may not take the time to re-build it since I have the EXCEL method working now. So for now, if you know that you don't want to miss out on these lights, and don't mind waiting (potentially months), I'm slowly populating a "build #3" database, and you can shoot me an email if your interested in being on it. After build #3, I plan on taking an indefinite "break" from any new light building.
Roger Huston
03-26-2012, 12:10 PM
Hopefully not too long of a break. I plan on showing-off your lights to the bike shops in my area and hopefully build some interest in your products for others :)
- Roger
Nikolai
03-28-2012, 06:56 PM
Definitely a wild and very interesting ride for Build #2.;)
Stephen
06-25-2012, 12:43 PM
OK, so due to the overwhelming demand for the lights (especially the taillight), I'm going to try and boost the total number of lights for build #3. If you've emailed me prior to today (June 25, 2012), then that means that you'll mostly likely be able to get some hardware. I'll have to cut off the increase, though, in just a few days when we start cutting housings.
Stephen
pkirkll
07-06-2012, 09:28 PM
Please put me on the waiting list in case someone falls out.
I have a credit card waiting to be used!!!!
Thanks so much!
paul
markbitter
04-02-2013, 12:12 PM
Surly a wild and very interesting ride for Build #2.I simply say thanks for the contribution.
trade mark attorneys Queensland (http://ip-gateway.com.au/)
Powered by vBulletin® Copyright © 2023 vBulletin Solutions, Inc. All rights reserved.